Structural Monitoring, Millom

Stone gable with scaffold. Tools on the boards and a mini prism bolted to the wall. Rooftops in the background.

Fixing monitoring prisms to a church gable for a long term study in Millom. I’ll first measure the prisms several times to establish the baseline position. Periodically I’ll return to the site and remeasure, reporting the deviation results to the structural engineers.