Bathymetric Survey, Wingate Reservoir

We needed to calculate the reservoir volume up to the spillway level. Using a radio-controlled boat with a sonar device, navigating on a grid pattern, the total station was continuously measuring to a prism attached to the deck. Back in the office, we had to match the timings of the “ping” depths to the prism position.